Any concrete lifting is dependent on the weather. Therefore, in our Alberta climate, outside work is generally done from mid-April through mid-November. Generally speaking, if there is frost in the ground, we cannot raise concrete with polyurethane foam. However, interior slabs in heated buildings can still be raised. Do not hesitate to contact us and we will be happy to let you know if it can be done.